here is the building half demolished that I am basing my final 3D piece on. the building is an old council set of offices that have been knocked down to make way for a temporary market.
here shows the image of how much everything would cost plus how we would measure out everything along with the measurements for each floor and the measurements for each length of steal that would be used to stand the building up and separate each floor. from these photos I have shown how I've measured out all the floors, a total of 3 floors each cut down to size on the band saw, these were all cut to the same measurements so they would line up and stand straight when the steal rods would be put through to make it stand on its own.